Initially appraoched to install a new hotwater cyclinder and solar thermal, we then were asked to deliver a 90KW biomass system proving heat and hotwater to a large farmhouse with standalone offices. As there was obvious solution to house the system that made economic sense, using our construction team, we built a bespoke biomass cabin to maximise the space allocated, and chip store which would allow blown in chip.