Case Studies

We installed a 29.5KW PV array on the roof of a listed mill building in Walkerburn. This ensured the electricty could be generated and used with the mill, and therefore maximised the value of generating electricity by offsetting electricty costs, as well ensuring the FIT rates to be leveraged as best they could.