Using the space provided within an unused stable block, we framed the building if fire resistant ply, installed an ETA 199KW boiler to provide heat to a workshop, 4 houses and a grain dryer. The chip store used part of an old farm shed and is able to store 3 months of fuel in a bespoke chip store with 5 meter sweeper.