Below are just a few of our commercial installations which include Scott Country Potatoes, EuroBusiness, Borthwick Hall, Trees by Post, Overlangshaw Ice Cream, Stamford Hall, Borders Railway, Hearthstanes Estate, Traquair House, Hundalee Guest House House, Pirnie House, Billerwell B&B, Baynes Bakery, Riddell Mill, Ostles Tyres, Peebles Hydro and many more. Additionally we have many more domestic solutions so just ask one of the team to help. For more information or if you would like a free consultation please use our contact form.
One of our largest projects yet. Working with a team of specialist civil engineers, boiler manufacturers and project managers, our role here was to connect two, 1MW biomass boilers to a large hotel which has 145 room (all with ensuites), a large commercial kitchen and laundry, and also a swimming pool, sauna and the usual spa treatments. We install...
Selected to install a 200KW PV array over 3 shed roofs, 2 of which were fabricated with asbetoss sheets. Being fully trained to work with asbestos, and after a full survey by our consultants, we carried this out, all cabling between buildings, all paperwork for Scottish Power, Roofit applications and much more. We also installed a 130KW ETA HACK bo...
This was one of our early district heating systems to 4 houses and a grain dryer. We opted for two cascaded boilers to accommodate a potential peaky load associated to drying grain. The system now dries chip as well as grain so more year round use and this helps to maximise the yield from RHI. Quote from Guy Lee "Renew Green Energy have installe...
A large farm in Melrose with 50KW of PV and a 199KW ETA Boiler, utilising an old grain drying building. The biomass system feeds heat and hotwater to 9 properties over a 300m underground pipe. Technically on the challenging side of things. This is supplemented with 50KW PV on a shed roof ...
We were selected to install a biomass solution to provide heat and hot water to a large house and holiday rentals. We designed the solution with x2, 90KW Froling Chip boilers as this would be able to accommodate a 'peaky load', and also with a small amount of additional capacity to add future services. Remote buffer tanks and pump stations were in...
The bakery consumes over 200,000 units of electricty every year and we were asked to provide a quote and references for a PV array. We were then selected to provide a solution. As the bakery hours are 4am to 2pm, we selected an easterly aspect to install 150KW (600 panels) and x8, 17KW PV invertors. We opted for a larger number of invertors to mini...
Using the space provided within an unused stable block, we framed the building if fire resistant ply, installed an ETA 199KW boiler to provide heat to a workshop, 4 houses and a grain dryer. The chip store used part of an old farm shed and is able to store 3 months of fuel in a bespoke chip store with 5 meter sweeper....
The system employed here was a 45KW log boiler. As the large farm house also offer B&B to one of the wings, the client knew he would have to be in attendance when his guest were booked in. Therefore managing the log boiler would not be a huge overhead. To help with the management and ensure only one load was needed per day, we also installed two sl...
We have carried out many ground mount solar PV arrays, on and off grid. We have delivered solutions which range from 4KW to 200KW, click here to have a look through these. ...
Working closely with BAM & Borders Railway, we were shortlisted and then selected to provide a small PV array on Tweedbank train station, fitting to a seamed zinc roof. Click here to see more images...
Initially appraoched to install a new hotwater cyclinder and solar thermal, we then were asked to deliver a 90KW biomass system proving heat and hotwater to a large farmhouse with standalone offices. As there was obvious solution to house the system that made economic sense, using our construction team, we built a bespoke biomass cabin to maximise ...
We installed a 29.5KW PV array on the roof of a listed mill building in Walkerburn. This ensured the electricty could be generated and used with the mill, and therefore maximised the value of generating electricity by offsetting electricty costs, as well ensuring the FIT rates to be leveraged as best they could....
A 130KW ETA Boiler proving heat and hotwater to farm house, holiday let, office, rennovated mill building and cottage. We created a bespoke boiler room inside a cattle shed, with a chip store to the rear. We also fitted a small grain dryer to be used for the summer months for drying logs. As there were 5 individual electricty meters at each propert...
We have installed biomass systems to many bed and breakfast establishments. They all have the same issue that they cannot afford to lose heat and hot water when guests are resident. Therefore on all of these, we work to meet the clients timescales and ensure minimum outages when cutting in the new system. This example is for a B&B in Hawick, a pell...
When you click here you will see a series of photographs from different sites that illustrate the broad range of stages, and what can be involved when installing biomass solutions. These show underground pipe work, individual boilers and cascaded boilers being set up. What options are available for fuel storage, logs, chip stores, pellet solutions....